If you are budgeting for exterior cladding in Wicken, Newmarket Roofers can give you a realistic picture of what affects the price and what you should expect to pay for a properly done job.
Call any time. Calls are answered day and night and passed straight to our roofers.
Exterior cladding quotes can differ by a significant amount between contractors, and even between similar properties. That is not always a sign that someone is overcharging or cutting corners - it often reflects genuine differences in what is being priced. A quote that includes scaffolding, a breather membrane, treated battens, and full detailing at windows and corners will always cost more than one that skips those elements. Understanding what drives the price helps you compare quotes fairly and avoid being caught out later.
We fit timber, composite and fibre cement cladding on homes in the local area. Here is an honest breakdown of the factors that affect cost.
The most obvious factor is the area of wall being clad, measured in square metres. Exterior cladding in the UK typically runs from around £80 to £180 per square metre installed, depending on the material and the complexity of the job. That range is wide because the other factors below pull the price in different directions.
Measuring wall area sounds straightforward but it is worth noting that window and door openings are usually deducted from the total area for materials, but not from the labour, because the detailing around openings takes time. A wall with many windows can actually cost more per square metre to clad than a plain wall with none.
The three main materials we fit have meaningfully different costs:
When comparing quotes, make sure each one specifies the exact product and board profile being priced. Composite boards, for example, vary enormously in quality and price between manufacturers. A cheap composite board may fade or delaminate within a few years.
Access equipment is one of the costs that surprises homeowners most. For ground-floor work on a single-storey extension, a set of steps or a small hop-up may be all that is needed. For a two-storey house, a full scaffold is normally required, and that alone can add £800 to £1,500 or more to the project depending on the size and configuration of the building.
Some contractors exclude scaffolding from their headline price and add it separately. Others include it. Make sure any quote you receive states clearly how access is being handled and whether it is included in the total. Properties with restricted garden access or unusual roof profiles may face higher access costs than a standard semi-detached on an open plot.
If the existing wall surface is in good condition - clean, dry and sound - preparation is minimal and the job proceeds quickly. If there is damp, damaged pointing, loose render or rot in existing timber elements, that work must be done before the cladding goes on. Preparatory repairs are charged separately and can add a meaningful sum to the project.
This is one reason a proper survey before pricing matters. A contractor who prices from photos or without looking at the wall closely is unlikely to have accounted for preparation work. When it is discovered on site, it becomes a variation to the contract.
A straightforward rectangular wall with no openings is the simplest and cheapest scenario. Every added complication takes more time and uses more material:
Each of these adds time. Time is labour, and labour is typically the largest proportion of the total cost on a cladding job.
Adding rigid insulation behind the cladding while the wall is open is far cheaper than returning to do it as a separate project. The extra material cost is modest relative to the overall job, and the labour uplift is small because the scaffolding and access equipment are already in place. If heat loss through older external walls is noticeable, this is worth discussing when you get your price.
Rigid insulation board in 50mm to 100mm thicknesses is the most practical option within a ventilated cladding system. The battens are either deepened or doubled up to accommodate it.
A quote that is noticeably cheaper than others is not always better value. Check whether it includes: stripping existing material, a breather membrane, treated battens, full detailing at all openings and corners, scaffolding or access equipment, and waste removal. If any of those are missing from the scope, the price will look lower on paper but the final cost may not be.
If you are planning cladding work in Wicken or nearby, call Newmarket Roofers for a roof and wall survey. We will look at your property, discuss the options and give you a clear price that covers the work properly.
No obligation · We'll call you to arrange a free visit