Newmarket Roofing Specialists
01638 596970 Get a Quote →

Lead Work in Bury St Edmunds

If you need lead work on a home in Bury St Edmunds, choosing the right material and specification for the job makes a bigger difference to long-term performance than almost anything else.

Lead Work · Bury St Edmunds

Expert Lead Work
in Bury St Edmunds

Lead Work: What It Covers and Where It Is Used

Lead flashing is the watertight junction between your roof covering and any vertical surface it meets: a chimney stack, a dormer cheek, a parapet wall, a bay window roof or a flat roof abutment against a house wall. Without correctly fitted lead at these points, water will find its way into the roof structure. For best results, lead should be hand-dressed on site to BS EN 12588.

Lead Codes: What They Mean and Which to Use

British Standard lead sheet is categorised by thickness, given as a code number. The thicker the lead, the greater its resistance to thermal movement, mechanical damage and fatigue cracking. Selecting the correct code for the application is not just best practice; it is part of doing the job properly.

  • Code 3 (1.32mm): The lightest commonly used weight. Suitable for soakers beneath step flashing on slated or tiled roofs. Not appropriate as a surface-exposed flashing because it is too thin to resist movement and damage reliably over the long term.
  • Code 4 (1.80mm): The most widely used weight for step flashings, cover flashings over chimney chases, and small apron flashings on dormers. Balances workability with durability and is the standard choice for most domestic flashing repairs.
  • Code 5 (2.24mm): Used for larger cover flashings, back gutters behind chimney stacks, and flat roof upstands where the lead will be exposed to more movement or where bay lengths need to be longer.
  • Code 6 (2.65mm): Specified for valley gutters, parapet gutters and situations where the lead carries standing water or where longer bay lengths are required. Heavier to work but significantly more resistant to fatigue cracking over time.
  • Code 7 and Code 8: Less common in domestic work, but used for wide parapet gutters, large flat roofs and specific structural details where thicker material is required by a survey or specification.

A common problem is roofers using code 3 or code 4 in situations that call for code 5 or code 6, either to reduce materials cost or because they are not familiar with the specification. This results in lead that cracks or lifts prematurely because it cannot accommodate the thermal movement over longer bay lengths.

Lead Versus Alternative Flashing Materials: An Honest Comparison

Lead is not the only flashing material available, and it is worth understanding the alternatives honestly before deciding what to specify.

Traditional Milled Lead

Lead has been used in British roofing for centuries. It is malleable enough to be hand-dressed to any profile, bonds reliably with mortar and masonry, and can be repaired rather than having to be wholly replaced if an isolated section is damaged. When correctly specified and installed, lead sheet has a functional life measured in decades. Its main disadvantages are cost and weight. Lead is significantly more expensive per square metre than alternative materials, and on a large valley or parapet replacement this is a meaningful difference.

Lead theft is also a practical concern on accessible properties. This is less of an issue on a steeply pitched main roof than on a flat porch, bay window or low extension, where lead can be removed quickly and easily. If theft is a risk, a security marking system can be applied to deter it, though no surface marking prevents a determined theft.

Aluminium Flashing

Aluminium flashing tape and pre-formed aluminium flashings are cheaper than lead and require less skilled labour to install. They are an option for some straightforward repairs. The drawbacks are real, however: aluminium is not as malleable as lead and does not dress as cleanly around complex profiles. It is also more vulnerable to corrosion in contact with wet mortar unless correctly isolated, and its long-term performance in exposed positions is considerably shorter than milled lead. For chimneys, valleys and parapets on a permanent domestic roof, aluminium is a lower-cost but lower-quality solution.

Zinc

Zinc sheet is used in some European roofing traditions and is occasionally specified in the UK, particularly on new-build or architect-designed properties. It is harder to work by hand than lead, less tolerant of contact with certain timbers without isolation, and more expensive than aluminium while being cheaper than lead. For standard domestic repairs in Bury St Edmunds, zinc is rarely the most practical choice, though it performs well when correctly installed on appropriate details.

Mortar Fillets

Some older properties have mortar fillets where a lead flashing would normally be expected, particularly at the base of chimney stacks. A mortar fillet is simply a shaped bead of mortar filling the angle between the roof covering and the chimney face. It requires no specialist materials and can be done quickly, which explains why it appears on some older roofs. Its lifespan is short: mortar does not flex, and frost and thermal movement cause it to crack, allowing water to track down behind it. A mortar fillet is not an acceptable long-term substitute for a properly dressed lead flashing, and if yours has one it is worth having it assessed.

EPDM Rubber Flashing

EPDM (synthetic rubber) is increasingly used in flat roof work and is sometimes applied as a flashing material at abutments. It is flexible, UV-stable and bonds well to clean surfaces. For a flat roof junction with an adjoining wall, EPDM can be a practical and cost-effective option. Where a complex three-dimensional profile is involved, such as a chimney with both step flashing and a back gutter, lead's ability to be hand-dressed to shape makes it the more reliable choice for most domestic situations.

Which Material Should You Choose?

For chimneys, dormers, valleys and parapets on a typical domestic property, milled lead to the correct BS EN 12588 code remains the most reliable long-term solution. The higher upfront material cost is offset by its functional lifespan and its repairability. For a straightforward flat roof abutment, EPDM is worth discussing as an alternative. For any application, avoid mortar fillets as a replacement for proper flashing, and be cautious of any quote that does not specify the lead code being used.

If you would like advice on the right material and specification for your Bury St Edmunds property, call Newmarket Roofers and we can walk you through the options for your specific situation.

Why choose Newmarket Roofers?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Fully insured, local team

Get your free quote

No obligation · We usually respond within 2 hours

By submitting you agree to being contacted about your enquiry. No spam, ever.

Emergency roof repair?

Storm damage, active leak, damaged ridge - we aim to be on-site within 24 hours.

Call now: 01638 596970